Agent skill

unknown-oleksandr-rud-aura-sdd-2

Stars 163
Forks 31

Install this agent skill to your Project

npx add-skill https://github.com/majiayu000/claude-skill-registry/tree/main/skills/development/unknown-oleksandr-rud-aura-sdd-2

SKILL.md

PM Sync Skill

pm-sync OVERVIEW actor: product-ops | mandate: Update stakeholders and close story | bounds: No technical changes, communication only

ORIENTATION Confirm .spec/constitution.md for current architecture and delivery guardrails. Review .spec/glossary.md entries relevant to stakeholder communication to keep terminology aligned. Load the product-ops persona brief from .spec/agents/product-ops.agent.md for format expectations.

LIFECYCLE TRANSITION from: E2E_COMPLETE ➜ to: SYNCED ACCEPTS_FROM: [qa-e2e] tag: [pm.sync] (append to story ## Lifecycle Log)

WHEN TO RUN Testing complete and stakeholder updates needed Story closure required with delivery summary External tracker updates needed for project management Success metrics validation and reporting required

REQUIRED INPUTS story_id test_results (from qa-e2e) delivery_metrics (performance, quality, timeline metrics) stakeholder_list (who needs updates) MCP tooling: [Read, Write]

CONTEXT PACK <<story.current_state>> <<personas.active_assignments>> <<recent_transition_log>> <<<GLOSSARY(term=stakeholder)>>>

EXECUTION ALGORITHM Validate prerequisites (test_results, delivery_metrics). If anything missing → BLOCKED format below. Collect evidence: test results, performance metrics, delivery outcomes. Validate all success metrics have been achieved or exceeded. Prepare stakeholder communication with delivery summary. Document final outcomes and lessons learned. Update external project management systems if required. Draft gate artifact using the structure in ARTIFACT OUTPUT. Append the TRANSITION LOG entry to the story's ## Lifecycle Log, matching persona tone. Update glossary/constitution if new terminology or workflows were introduced.

ARTIFACT OUTPUT === Stakeholder Update === summary: inputs:test_results= delivery_metrics= stakeholder_list= evidence:kpi_validation|result=<met/exceeded>|ref=<path_to_metrics> risks:[ ]<risk_description>|owner=|mitigation= next_steps:<follow-up needed or n/a> === END Stakeholder Update ===

TRANSITION LOG TEMPLATE [TRANSITION|pm.sync] by product-ops MODE: strict|tolerant|branch FROM_STATE: E2E_COMPLETE TO_STATE: SYNCED WHY:

  • Testing complete and stakeholder communication required
  • Story closure needed with delivery summary and outcomes OUTPUT: === Stakeholder Update === summary:Completed stakeholder communication and story closure with successful delivery. inputs:test_results=refs=qa/e2e/results.md delivery_metrics=docs/performance-summary.pdf evidence:kpi_validation|result=met|ref=metrics/final-kpi-validation.csv risks:[ ]Post-launch monitoring required|owner=product-ops|mitigation=setup_alerts next_steps:Archive story and begin post-launch monitoring. === END Stakeholder Update === FOLLOW-UP:
  • Archive project artifacts - owner=product-ops - due=2025-10-28

BLOCKED FORMAT BLOCKED(missing_inputs=[test_results, delivery_metrics], unblock_steps=[complete_testing, gather_metrics])

GUARDRAILS Keep entries <=120 chars per line for CLI readability. All success metrics must be validated before stakeholder communication. Stakeholder updates must include both achievements and lessons learned. Update .spec/glossary.md if you introduce new terms, channels, or artifacts.


PM Sync skill for stakeholder communication and story closure with delivery validation and outcomes reporting.

Didn't find tool you were looking for?

Be as detailed as possible for better results