Fast sprint status check. Reads the current sprint plan, scans story files for status, and produces a concise progress snapshot with burndown assessment and emerging risks. Run at any time during a sprint for quick situational awareness. Use when user asks 'how is the sprint going', 'sprint update', 'show sprint progress'.
Install this agent skill to your Project
npx add-skill https://github.com/Donchitos/Claude-Code-Game-Studios/tree/main/.claude/skills/sprint-status
SKILL.md
Sprint Status
This is a fast situational awareness check, not a sprint review. It reads the
current sprint plan and story files, scans for status markers, and produces a
concise snapshot in under 30 lines. For detailed sprint management, use
/sprint-plan update or /milestone-review.
This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.
1. Find the Sprint
Argument: $ARGUMENTS[0] (blank = use current sprint)
- If an argument is given (e.g.,
/sprint-status 3), searchproduction/sprints/for a file matchingsprint-03.md,sprint-3.md, or similar. Report which file was found. - If no argument is given, find the most recently modified file in
production/sprints/and treat it as the current sprint. - If
production/sprints/does not exist or is empty, report: "No sprint files found. Start a sprint with/sprint-plan new." Then stop.
Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate
2. Calculate Days Remaining
Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed
If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."
3. Scan Story Status
First: check for production/sprint-status.yaml.
If it exists, read it directly — it is the authoritative source of truth.
Extract status for each story from the status field. No markdown scanning needed.
Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.
If sprint-status.yaml does not exist (legacy sprint or first-time setup),
fall back to markdown scanning:
- If the entry references a story file path, check if the file exists. Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
- If the entry has no file path (inline task in the sprint plan), scan the sprint plan itself for status markers next to that entry.
- If no status marker is found, classify as NOT STARTED.
- If a file is referenced but does not exist, classify as MISSING and note it.
When using the fallback, add a note at the bottom of the output:
"⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."
Optionally (fast check only — do not do a deep scan): grep src/ for a
directory or file name that matches the story's system slug to check for
implementation evidence. This is a hint only, not a definitive status.
Stale Story Detection
After collecting status for all stories, check each IN PROGRESS story for staleness:
- For each story that has a referenced file, read the file and look for a
Last Updated:field in the frontmatter or header (e.g.,Last Updated: 2026-04-01orupdated: 2026-04-01). Accept any reasonable date field name:Last Updated,Updated,last-updated,updated_at. - Calculate days since that date using today's date.
- If the date is more than 2 days ago, flag the story as STALE.
- If no date field is found in the story file, note "no timestamp — cannot check staleness."
- If the story has no referenced file (inline task), note "inline task — cannot check staleness."
STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).
Stale story escalation: If any IN PROGRESS story is flagged STALE, the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [N] story(ies) with no progress in [N] days."
4. Burndown Assessment
Calculate:
- Tasks complete (DONE or COMPLETE)
- Tasks in progress (IN PROGRESS)
- Tasks blocked (BLOCKED)
- Tasks not started (NOT STARTED or MISSING)
- Completion percentage: (complete / total) * 100
Assess burndown by comparing completion percentage to time consumed percentage:
- On Track: completion % is within 10 points of time consumed % or ahead
- At Risk: completion % is 10-25 points behind time consumed %
- Behind: completion % is more than 25 points behind time consumed %
If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."
5. Output
Keep the total output to 30 lines or fewer. Use this format:
## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])
### Progress: [complete/total] tasks ([%])
| Story / Task | Priority | Status | Owner | Blocker |
|----------------------|------------|-------------|---------|----------------|
| [title] | Must Have | DONE | [owner] | |
| [title] | Must Have | IN PROGRESS | [owner] | |
| [title] | Must Have | BLOCKED | [owner] | [brief reason] |
| [title] | Should Have| NOT STARTED | [owner] | |
### Attention Needed
| Story / Task | Status | Last Updated | Days Stale | Note |
|----------------------|-------------|----------------|------------|----------------|
| [title] | IN PROGRESS | [date or N/A] | [N days] | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |
*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*
### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]
### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]
### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]
### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]
6. Fast Escalation Rules
Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):
Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:
SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.
Completion flag — if all Must Have stories are DONE:
All Must Haves complete. Team can pull from Should Have backlog.
Missing stories flag — if any referenced story files do not exist:
NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.
Collaborative Protocol
This skill is read-only. It reports observed facts from files on disk.
- It does not update the sprint plan
- It does not change story status
- It does not propose scope cuts (that is
/sprint-plan update) - It makes at most one recommendation per run
For more detail on a specific story, the user can read the story file directly
or run /story-readiness [path].
For sprint replanning, use /sprint-plan update.
For end-of-sprint retrospective, use /milestone-review.
Recommended Agent Skills
Expand your agent's capabilities with these related and highly-rated skills.
skill-improve
Improve a skill using a test-fix-retest loop. Runs static checks, proposes targeted fixes, rewrites the skill, re-tests, and keeps or reverts based on score change.
localize
Full localization pipeline: scan for hardcoded strings, extract and manage string tables, validate translations, generate translator briefings, run cultural/sensitivity review, manage VO localization, test RTL/platform requirements, enforce string freeze, and report coverage.
dev-story
Read a story file and implement it. Loads the full context (story, GDD requirement, ADR guidelines, control manifest), routes to the right programmer agent for the system and engine, implements the code and test, and confirms each acceptance criterion. The core implementation skill — run after /story-readiness, before /code-review and /story-done.
team-level
Orchestrate level design team: level-designer + narrative-director + world-builder + art-director + systems-designer + qa-tester for complete area/level creation.
sprint-plan
Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.
team-narrative
Orchestrate the narrative team: coordinates narrative-director, writer, world-builder, and level-designer to create cohesive story content, world lore, and narrative-driven level design.
Didn't find tool you were looking for?