Scope Check

This skill is read-only — it reports findings but writes no files.

Compares original planned scope against current state to detect, quantify, and triage scope creep.

Argument: $ARGUMENTS[0] — feature name, sprint number, or milestone name.


Phase 1: Find the Original Plan

Locate the baseline scope document for the given argument:

  • Feature name → read design/gdd/[feature].md or matching file in design/
  • Sprint number (e.g., sprint-3) → read production/sprints/sprint-03.md or similar
  • Milestone → read production/milestones/[name].md

If the document is not found, report the missing file and stop. Do not proceed without a baseline to compare against.


Phase 2: Read the Current State

Check what has actually been implemented or is in progress:

  • Scan the codebase for files related to the feature/sprint
  • Read git log for commits related to this work (git log --oneline --since=[start-date])
  • Check for TODO/FIXME comments that indicate unfinished scope additions
  • Check active sprint plan if the feature is mid-sprint

Phase 3: Compare Original vs Current Scope

Produce the comparison report:

markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]

### Original Scope
[List of items from the original plan]

### Current Scope
[List of items currently implemented or in progress]

### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |

### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |

### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)

### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]

### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from producer/creative-director]

Phase 4: Verdict

Assign a canonical verdict based on net scope change:

Net Change Verdict Meaning
≤10% PASS On Track — within acceptable variance
10–25% CONCERNS Minor Creep — manageable with targeted cuts
25–50% FAIL Significant Creep — must cut or formally extend timeline
>50% FAIL Out of Control — stop, re-plan, escalate to producer

Output the verdict prominently:

**Scope Verdict: [PASS / CONCERNS / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]

Phase 5: Next Steps

After presenting the report, offer concrete follow-up:

  • PASS → no action required. Suggest re-running before next milestone.
  • CONCERNS → offer to identify the 2–3 additions with best cut ratio. Reference /sprint-plan update to formally re-scope.
  • FAIL → recommend escalating to producer. Reference /sprint-plan update for re-planning or /estimate to re-baseline timeline.

Always end with:

"Run /scope-check [name] again after cuts are made to verify the verdict improves."


Rules

  • Scope creep is additions without corresponding cuts or timeline extensions
  • Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
  • When recommending cuts, prioritize preserving the core player experience over nice-to-haves
  • Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is

Expand your agent's capabilities with these related and highly-rated skills.

Donchitos/Claude-Code-Game-Studios

skill-improve

Improve a skill using a test-fix-retest loop. Runs static checks, proposes targeted fixes, rewrites the skill, re-tests, and keeps or reverts based on score change.

8,725 1,345
Explore
Donchitos/Claude-Code-Game-Studios

localize

Full localization pipeline: scan for hardcoded strings, extract and manage string tables, validate translations, generate translator briefings, run cultural/sensitivity review, manage VO localization, test RTL/platform requirements, enforce string freeze, and report coverage.

8,725 1,345
Explore
Donchitos/Claude-Code-Game-Studios

dev-story

Read a story file and implement it. Loads the full context (story, GDD requirement, ADR guidelines, control manifest), routes to the right programmer agent for the system and engine, implements the code and test, and confirms each acceptance criterion. The core implementation skill — run after /story-readiness, before /code-review and /story-done.

8,725 1,345
Explore
Donchitos/Claude-Code-Game-Studios

team-level

Orchestrate level design team: level-designer + narrative-director + world-builder + art-director + systems-designer + qa-tester for complete area/level creation.

8,725 1,345
Explore
Donchitos/Claude-Code-Game-Studios

sprint-plan

Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.

8,725 1,345
Explore
Donchitos/Claude-Code-Game-Studios

team-narrative

Orchestrate the narrative team: coordinates narrative-director, writer, world-builder, and level-designer to create cohesive story content, world lore, and narrative-driven level design.

8,725 1,345
Explore

Didn't find tool you were looking for?

Be as detailed as possible for better results