GATE 4: PLANNING — PLANNER PROTOCOL
Agent: PLANNER Gate: 4 of 6 Prerequisite: Gate 3 (Test Design) COMPLETE Output: docs/planning/ROADMAP.md with traced tasks
GATE 4 ENTRY CHECKLIST
Before proceeding, verify:
- .fortress/gates/GATE_3_TEST_DESIGN.md exists
- All test stubs exist in tests/
- TEST_MATRIX.md is complete
-
pytest --collect-onlysucceeds
If any checkbox fails: STOP. Complete Gate 3 first.
PLANNER PROTOCOL
Core Principle: TASKS TRACE TO SPECS
❌ FORBIDDEN: "Implement feature X"
✅ REQUIRED: "Implement S001 - Package validation"
TRACES: S001, INV001, INV002
TESTS: T001.1-T001.10
Every task MUST link to:
- SPEC_ID(s) it implements
- INV_ID(s) it enforces
- TEST_ID(s) it must pass
Step 1: Define Task Size Limits
| Rule | Limit | Reason |
|---|---|---|
| Max task size | 8 hours | Smaller = better estimates |
| Estimation multiplier | 2.5x | Always over-estimate |
| Buffer per week | 20% | Unexpected issues |
Step 2: Create Task Breakdown
For each SPEC_ID, create implementation tasks:
## TASK: W1.1 — Implement Core Types
### Traces
- SPEC: S001, S002
- INVARIANTS: INV001, INV002
- TESTS: T001.1-T001.5
### Definition
Implement the core data types for PackageRisk, Signals, and Recommendation.
### Acceptance Criteria
- [ ] T001.1 passes (valid package structure)
- [ ] T001.2 passes (empty input handling)
- [ ] INV001 enforced (risk_score bounds)
- [ ] INV002 enforced (signals not None)
- [ ] mypy passes with no errors
- [ ] 100% coverage on new code
### Estimated Effort
- Optimistic: 2 hours
- Likely: 4 hours
- Pessimistic: 8 hours
- **Planned**: 4 hours × 2.5 = 10 hours
### Dependencies
- None (first task)
### Pre-Conditions
- Test stubs T001.1-T001.5 exist (GATE 3)
- Types defined in architecture (GATE 1)
### Post-Conditions
- Tests T001.1-T001.5 pass (not skipped)
- src/phantom_guard/core/types.py exists
- Code has IMPLEMENTS: S001 comments
Step 3: Create Week Plans
Group tasks into weeks:
# docs/planning/ROADMAP.md
## Week 1: Core Types & Detection Engine
### Goals
- Implement S001-S005 (Core detection)
- All T001.* tests passing
- 90% coverage on core module
### Tasks
| Task | SPEC | Hours | Status |
|:-----|:-----|:------|:-------|
| W1.1 | S001 | 10 | PENDING |
| W1.2 | S002 | 8 | PENDING |
| W1.3 | S003 | 6 | PENDING |
| W1.4 | S004 | 8 | PENDING |
| W1.5 | S005 | 8 | PENDING |
| **Buffer** | - | 10 | - |
| **Total** | - | 50 | - |
### Exit Criteria
- [ ] All W1.* tasks complete
- [ ] T001-T005 tests passing
- [ ] Coverage ≥90% on core/
- [ ] Hostile review passed
---
## Week 2: Registry Clients
### Goals
- Implement S030-S055 (All registry clients)
- All T030-T055 tests passing
- Integration tests with live APIs
### Tasks
| Task | SPEC | Hours | Status |
|:-----|:-----|:------|:-------|
| W2.1 | S030-S035 | 12 | PENDING |
| W2.2 | S040-S045 | 12 | PENDING |
| W2.3 | S050-S055 | 12 | PENDING |
| W2.4 | Cache integration | 6 | PENDING |
| **Buffer** | - | 8 | - |
| **Total** | - | 50 | - |
### Exit Criteria
- [ ] All W2.* tasks complete
- [ ] T030-T055 tests passing
- [ ] Live API tests work
- [ ] Hostile review passed
Step 4: Create Dependency Graph
## DEPENDENCY GRAPH
W1.1 (Core Types) │ ├── W1.2 (Risk Scoring) ──┐ │ │ ├── W1.3 (Signal Detection)──┤ │ │ └── W1.4 (Pattern Matching)──┘ │ ▼ W1.5 (Detector Integration) │ ┌──────────────────┼──────────────────┐ │ │ │ ▼ ▼ ▼ W2.1 (PyPI) W2.2 (npm) W2.3 (crates) │ │ │ └──────────────────┼──────────────────┘ │ ▼ W2.4 (Cache Integration) │ ▼ W3.1 (CLI Interface)
### Critical Path
W1.1 → W1.5 → W2.1 → W2.4 → W3.1 → W4.1 (Release)
Step 5: Risk Assessment
## RISK ASSESSMENT
| Task | Risk Level | Risk Factor | Mitigation |
|:-----|:-----------|:------------|:-----------|
| W1.1 | LOW | Well-defined types | N/A |
| W1.2 | MEDIUM | Algorithm complexity | Property tests |
| W2.1 | HIGH | External API | Mocking, retries |
| W2.2 | HIGH | External API | Mocking, retries |
| W3.1 | LOW | Standard CLI patterns | typer framework |
### Contingency Plans
**If PyPI API changes:**
1. Switch to cached-only mode
2. Document regression
3. Implement new parser
**If rate limiting hit:**
1. Implement backoff
2. Add queue mechanism
3. Consider API key
ROADMAP DOCUMENT TEMPLATE
# Phantom Guard — Development Roadmap
> **Version**: 0.1.0
> **Created**: YYYY-MM-DD
> **Last Updated**: YYYY-MM-DD
> **Status**: ACTIVE
---
## Overview
### MVP Target
- Date: YYYY-MM-DD
- Scope: Core detection + CLI + 3 registries
### Total Effort
- Planned: X weeks
- Buffer: Y% contingency
---
## Phase 1: Core Engine (Weeks 1-2)
[Detailed week plans with tasks]
## Phase 2: Integrations (Weeks 3-4)
[Detailed week plans with tasks]
## Phase 3: CLI & Hooks (Weeks 5-6)
[Detailed week plans with tasks]
## Phase 4: Polish & Release (Weeks 7-8)
[Release preparation tasks]
---
## Task Registry
| Task ID | SPEC | Description | Hours | Status | Week |
|:--------|:-----|:------------|:------|:-------|:-----|
| W1.1 | S001 | Core types | 10 | PENDING | 1 |
| W1.2 | S002 | Risk scoring | 8 | PENDING | 1 |
| ... | ... | ... | ... | ... | ... |
---
## Progress Tracking
### Week 1
- [ ] W1.1 Complete
- [ ] W1.2 Complete
- [ ] Week 1 hostile review
### Week 2
...
---
## Trace Matrix
| Task | SPEC_IDs | INV_IDs | TEST_IDs |
|:-----|:---------|:--------|:---------|
| W1.1 | S001 | INV001, INV002 | T001.1-T001.5 |
| ... | ... | ... | ... |
GATE 4 EXIT CHECKLIST
Before Gate 4 is complete:
- docs/planning/ROADMAP.md exists
- Every task has SPEC trace
- Every task has TEST trace
- Every task < 8 hours
- 20% buffer per week
- Dependency graph defined
- Risk assessment complete
- HOSTILE_PLANNER review passed
If any checkbox fails: DO NOT PROCEED TO IMPLEMENTATION.
HOSTILE_PLANNER REVIEW
After completing roadmap:
/hostile-review planning
The reviewer checks:
- Are estimates realistic?
- Are dependencies correct?
- Are traces complete?
- Are risks identified?
- Is critical path clear?
RECORDING GATE COMPLETION
# .fortress/gates/GATE_4_PLANNING.md
## Gate 4: Planning — COMPLETE
**Date**: YYYY-MM-DD
**Approver**: HOSTILE_PLANNER
**Output**: docs/planning/ROADMAP.md
### Summary
- X tasks defined
- Y weeks planned
- Z hours total (with buffer)
### Schedule
| Phase | Weeks | Hours |
|:------|:------|:------|
| Core | 1-2 | X |
| Integrations | 3-4 | Y |
| CLI | 5-6 | Z |
| Release | 7-8 | W |
### Next Step
Begin implementation with /implement W1.1
IMPLEMENTATION WORKFLOW
After Gate 4, use /implement for each task:
/implement W1.1
This triggers:
- Load task definition
- Verify pre-conditions
- TDD implementation cycle
- Verify post-conditions
- Mark task complete
PROTOCOL VIOLATIONS
| Violation | Response |
|---|---|
| Task without SPEC trace | Add trace |
| Task > 8 hours | Split task |
| No buffer in week | Add 20% buffer |
| Skipped HOSTILE review | Run review |
| Starting implementation without Gate 4 | BLOCKED |
Gate 4 is about PLANNING what to build. Gate 5 is about VALIDATING what was built.
Didn't find tool you were looking for?