Agent skill
milestone-review
Generates a comprehensive milestone progress review including feature completeness, quality metrics, risk assessment, and go/no-go recommendation. Use at milestone checkpoints or when evaluating readiness for a milestone deadline.
Install this agent skill to your Project
npx add-skill https://github.com/Donchitos/Claude-Code-Game-Studios/tree/main/.claude/skills/milestone-review
SKILL.md
Phase 0: Parse Arguments
Extract the milestone name (current or a specific name) and resolve the review mode (once, store for all gate spawns this run):
- If
--review [full|lean|solo]was passed → use that - Else read
production/review-mode.txt→ use that value - Else → default to
lean
See .claude/docs/director-gates.md for the full check pattern.
Phase 1: Load Milestone Data
Read the milestone definition from production/milestones/. If the argument is current, use the most recently modified milestone file.
Read all sprint reports for sprints within this milestone from production/sprints/.
Phase 2: Scan Codebase Health
- Scan for
TODO,FIXME,HACKmarkers that indicate incomplete work - Check the risk register at
production/risk-register/
Phase 3: Generate the Milestone Review
# Milestone Review: [Milestone Name]
## Overview
- **Target Date**: [Date]
- **Current Date**: [Today]
- **Days Remaining**: [N]
- **Sprints Completed**: [X/Y]
## Feature Completeness
### Fully Complete
| Feature | Acceptance Criteria | Test Status |
|---------|-------------------|-------------|
### Partially Complete
| Feature | % Done | Remaining Work | Risk to Milestone |
|---------|--------|---------------|------------------|
### Not Started
| Feature | Priority | Can Cut? | Impact of Cutting |
|---------|----------|----------|------------------|
## Quality Metrics
- **Open S1 Bugs**: [N] -- [List]
- **Open S2 Bugs**: [N]
- **Open S3 Bugs**: [N]
- **Test Coverage**: [X%]
- **Performance**: [Within budget? Details]
## Code Health
- **TODO count**: [N across codebase]
- **FIXME count**: [N]
- **HACK count**: [N]
- **Technical debt items**: [List critical ones]
## Risk Assessment
| Risk | Status | Impact if Realized | Mitigation Status |
|------|--------|-------------------|------------------|
## Velocity Analysis
- **Planned vs Completed** (across all sprints): [X/Y tasks = Z%]
- **Trend**: [Improving / Stable / Declining]
- **Adjusted estimate for remaining work**: [Days needed at current velocity]
## Scope Recommendations
### Protect (Must ship with milestone)
- [Feature and why]
### At Risk (May need to cut or simplify)
- [Feature and risk]
### Cut Candidates (Can defer without compromising milestone)
- [Feature and impact of cutting]
## Go/No-Go Assessment
**Recommendation**: [GO / CONDITIONAL GO / NO-GO]
**Conditions** (if conditional):
- [Condition 1 that must be met]
- [Condition 2 that must be met]
**Rationale**: [Explanation of the recommendation]
## Action Items
| # | Action | Owner | Deadline |
|---|--------|-------|----------|
Phase 3b: Producer Risk Assessment
Review mode check — apply before spawning PR-MILESTONE:
solo→ skip. Note: "PR-MILESTONE skipped — Solo mode." Present the Go/No-Go section without a producer verdict.lean→ skip (not a PHASE-GATE). Note: "PR-MILESTONE skipped — Lean mode." Present the Go/No-Go section without a producer verdict.full→ spawn as normal.
Before generating the Go/No-Go recommendation, spawn producer via Task using gate PR-MILESTONE (.claude/docs/director-gates.md).
Pass: milestone name and target date, current completion percentage, blocked story count, velocity data from sprint reports (if available), list of cut candidates.
Present the producer's assessment inline within the Go/No-Go section. The producer's verdict (ON TRACK / AT RISK / OFF TRACK) informs the overall recommendation — do not issue a GO against an OFF TRACK producer verdict without explicit user acknowledgement.
Phase 4: Save Review
Present the review to the user.
Ask: "May I write this to production/milestones/[milestone-name]-review.md?"
If yes, write the file, creating the directory if needed. Verdict: COMPLETE — milestone review saved.
If no, stop here. Verdict: BLOCKED — user declined write.
Phase 5: Next Steps
- Run
/gate-checkfor a formal phase gate verdict if this milestone marks a development phase boundary. - Run
/sprint-planto adjust the next sprint based on the scope recommendations above.
Recommended Agent Skills
Expand your agent's capabilities with these related and highly-rated skills.
skill-improve
Improve a skill using a test-fix-retest loop. Runs static checks, proposes targeted fixes, rewrites the skill, re-tests, and keeps or reverts based on score change.
localize
Full localization pipeline: scan for hardcoded strings, extract and manage string tables, validate translations, generate translator briefings, run cultural/sensitivity review, manage VO localization, test RTL/platform requirements, enforce string freeze, and report coverage.
dev-story
Read a story file and implement it. Loads the full context (story, GDD requirement, ADR guidelines, control manifest), routes to the right programmer agent for the system and engine, implements the code and test, and confirms each acceptance criterion. The core implementation skill — run after /story-readiness, before /code-review and /story-done.
team-level
Orchestrate level design team: level-designer + narrative-director + world-builder + art-director + systems-designer + qa-tester for complete area/level creation.
sprint-plan
Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs.
team-narrative
Orchestrate the narrative team: coordinates narrative-director, writer, world-builder, and level-designer to create cohesive story content, world lore, and narrative-driven level design.
Didn't find tool you were looking for?